Borgwarner Saltillo

The limitation of schedules for carrying out installation work, since the production areas were kept operating continuously. This made it necessary to carefully coordinate access, maneuvers and safety measures such as working at heights and work with electrical hazards, as well as carrying out part of the tasks so as not to interfere with the production line, coordinating with CFE.
Initial Challenges
Technical and logistical coordination within the automotive company's facilities, where it was necessary to carefully plan the installation of the panels between the company and the CFE. In addition, the structural and electrical design of the new plant was reviewed to ensure the compatibility of the solar system with the new infrastructure, ensuring an orderly and safe development of the project.
Technical and logistic coordination
Detailed planning of the installation within the automotive company's facilities, in coordination with the company and CFE.
Joint installation planning
Alignment between the parties involved to define times, accesses and working conditions.
Structural review of the project
Evaluation of the structural design of the new plant to ensure the correct integration of the solar system.
Electrical compatibility and safety
Verification of the electrical system to ensure an orderly, safe and compatible development with the new infrastructure.
Project Timeline



Results we have achieved for our clients
.avif)

487.50 kW AC


240 kW AC