Saucillo

One of the main problems was the complexity of the combined route of the overhead and underground lines, which involved crossing roads and coordinating permits with different local agencies and with CFE. This required precise technical and administrative management, ensuring the correct interconnection of the system without affecting park operations.
Initial Challenges
In this project, the main challenge was to design and execute the medium voltage line, combining aerial and underground sections, to achieve the interconnection of the industrial park with the local CFE substation. Detailed planning and close coordination with the authorities and the commission were required, ensuring regulatory compliance, operational safety and timely commissioning.
Design of the medium voltage line
The main challenge was to design and execute a medium voltage line that would combine aerial and underground sections.
Interconnection with CFE substation
The infrastructure was developed to connect the industrial park with the local CFE substation efficiently.
Institutional planning and coordination
Detailed planning and close coordination was carried out with local authorities and CFE.
Compliance, Security and Commissioning
The project ensured regulatory compliance, operational safety and entry into operation in a timely manner.
Project Timeline